Actualités de Deswik
Filter By
preview title
preview summary
Application of simulation and optimization to support mine plan execution
Colin Eustace (Head of Simulation, Deswik), and Katherine Hynard (Senior Data Analyst, Deswik) discuss the application of simulation and optimization to support the execution of mine plans. This extended abstract has been reproduced with permission from Mining Engineering and the Society for Mining, Metallurgy & Exploration Inc.
Simulation unlocks haulage efficiency at Carrapateena, cutting delays and optimizing fleet performance in BHP’s high-throughput underground operation
Discover how simulation can unlock underground haulage efficiency in The Rock Wrangler's article, featuring Deswik's Head of Simulation, Colin Eustace and his presentation at the 2025 AusIMM Underground Operators Conference.
How an innovative methodology transformed strategic decision-making in a greenfield polymetallic project
Deswik conducted a strategic mine planning study for an greenfield polymetallic project using the APEX to develop an optimal Life-of-Mine (LoM) plan, enhancing decision-making and maximizing Net Present Value (NPV) through a novel, time-driven structured optimization approach.
Gestion du prélèvement automatisée et optimisation de la répartition des chargeurs
Grâce à la mise en œuvre de Deswik ORB, une société minière de niveau 1 avec une grande exploitation par blocs foudroyés a optimisé ses processus de planification.
Améliorer l'autonomie souterraine
Les fonctionnalités nouvelles et améliorées du module ORB Live/Autonomous font passer la répartition autonome et la gestion dynamique des galeries en temps réel au niveau supérieur et ouvrent la voie à des opérations souterraines entièrement autonomes.
Déblocage des ressources critiques grâce à l'exploitation minière de masse entièrement autonome
Sandvik Mining and Rock Solutions réunit un ensemble de technologies qui permettront une autonomie totale, de la planification à l'exécution, pour les opérations minières souterraines de masse.
Un entretien avec Russell Vance
Le directeur régional de Deswik pour l'Amérique du Nord, explique comment Deswik investit dans ses solutions de gestion des données et d'exploitation pour aider les sociétés minières à améliorer leur efficacité et à normaliser leurs processus.
Exploitation de la capacité cachée et d'autres efficiences grâce à une planification optimale de la logistique ferroviaire vrac
RACE Planner a optimisé la logistique du transport ferroviaire vrac pour un grand opérateur d'une chaîne d'approvisionnement agricole dans les États australiens de Nouvelle-Galles du Sud et du Victoria en automatisant la planification des trains, en améliorant l'accès au réseau, en réduisant le temps de planification et en maximisant l'utilisation des actifs.
Optimisation de la chaîne d'approvisionnement minière avec Gurobi
Deswik, en collaboration avec Gurobi, s'est servie de RACE Planner pour optimiser les chaînes d'approvisionnement. Ceci a permis d'améliorer l'usage des ressources, le débit et la rentabilité pour les parties prenantes ; en outre, l'efficacité a été augmentée de 10 à 30 % et les temps de cycle de planification ont été considérablement diminués, grâce à la planification et à l'ordonnancement automatisés.
Modernisation des opérations ferroviaires avec un système de gestion des trains en temps réel
Le logiciel RACE Live de Deswik a modernisé les opérations ferroviaires dans le centre du Queensland en automatisant la saisie des données, la gestion des calendriers et les tâches de conformité, ce qui a permis d'améliorer l'efficacité, d'effectuer un suivi précis des trains et de réaliser les entretiens de manière opportune.
Déterminez la capacité de production optimale en modélisant un réseau de charbon plus grand
En tant qu'outil d'aide à la décision, RACE Planner a aidé une société minière de charbon au centre du Queensland à optimiser sa capacité de production, grâce à la modélisation du réseau de charbon, à l'identification des goulets d'étranglement et en fournissant des perspectives pour la planification stratégique et l'utilisation efficace des ressources.
Maximisez la vitesse de circulation du charbon à travers des chaînes de valeur minières complexes
RACE Planner a aidé un opérateur de terminal charbonnier majeur sur la côte est de l'Australie à maximiser la capacité de traitement du charbon, à augmenter le débit du terminal, à améliorer la précision de la planification et à générer des calendriers plus rapides et plus précis en synchronisant les opérations entrantes et sortantes.
Utilisation de RACE pour exploiter l'un des plus grands réseaux interconnectés de charbon au monde
RACE Planner a optimisé la planification d'un grand réseau ferroviaire de charbon, en maximisant la capacité, en minimisant les interruptions de maintenance et en augmentant l'efficacité globale et le débit.
Maximisez l'activité des équipes grâce à l'optimisation des opérations de transport ferroviaire
Le module RACE Crew de Deswik, alimenté par Gurobi, a optimisé les calendriers des équipages pour un chemin de fer australien, ce qui a réduit le temps où les conducteurs étaient hors travail de 50 %, en diminuant les besoins quotidiens en conducteurs de 8 % et a amélioré l'efficacité opérationnelle et les coûts de main-d'œuvre tout en garantissant des calendriers juridiquement conformes.
Affectez efficacement les équipages aux dépôts et menez des études stratégiques
RACE Crew automatise l'affectation des équipages pour un chemin de fer important, tout en garantissant la conformité juridique, le respect des conventions collectives, l'optimisation des indicateurs de performance clés et la possibilité pour les planificateurs des équipages de modéliser divers scénarios opérationnels, afin d'améliorer la prise de décision et l'utilisation des équipages.
Optimisation des calendriers des équipages pour améliorer l'efficacité opérationnelle
Dans une étude de cas conjointe avec Gurobi, découvrez comment RACE peut générer rapidement des plans d'affectation des équipages optimaux qui permettent aux clients de gagner du temps et de l'argent.
Optimisation de l'une des chaînes d'approvisionnement en charbon les plus complexes au monde
Avec RACE Planner, le coordinateur de la chaîne de charbon de Hunter Valley (HVCCC) a optimisé l'une des chaînes d'approvisionnement en charbon les plus complexes au monde. Ainsi, l'efficacité a été renforcée, le temps de planification a été réduit et la prise de décision a été améliorée grâce à la planification automatisée et des opérations synchronisées.
Les exploitants miniers doivent agir rapidement pour atténuer les risques liés aux données en matière de santé et de sécurité
Jay Gillon, directeur du développement commercial de Deswik pour l'Amérique du Nord, préconise l'adoption rapide des systèmes de gestion des données modernes, afin d'atténuer les risques de santé et de sécurité du secteur.
Boliden accélère les flux de travail et les efficiences opérationnelles avec Deswik MDM
Après la mise en œuvre de Deswik MDM, Boliden a constaté des améliorations importantes en matière de gestion des risques et d'exploitation opérationnelle, ce qui lui a permis de renforcer la collaboration et de fournir des résultats consistants tout au long de la chaîne de valeur minière et des métaux.
Tirez le meilleur parti des services de support de Deswik
Mark Vanderbeek, responsable de l'assistance mondiale de Deswik, explique comment l'assistance de Deswik peut aider les clients et comment les contacter.
Sandvik fait l'acquisition de MCB Brazil, partenaire revendeur de Deswik au Brésil
Sandvik a signé un accord pour l'acquisition de MCB Services and Minerals, un vendeur de logiciels et de services miniers et partenaire revendeur exclusif de Deswik au Brésil.
Deswik accueille Polymathian Industrial Mathematics après l'acquisition de Sandvik
Polymathian signe un accord d'acquisition par Sandvik et rejoint Deswik au sein de l'unité commerciale des solutions minières et rocheuses de Sandvik.
Deswik étend sa présence locale en Inde
Deswik continuera de soutenir l'Inde dans ses efforts pour mettre en place des opérations minières efficaces et durables avec une présence locale à Gurugram, dans l'Haryana.
Une nouvelle approche de l'optimisation des fosses
Dans chaque entreprise minière, la détermination de la limite ultime de la fosse reste le principal défi pour les planificateurs miniers pour assurer la réussite du projet. Malgré les progrès dans les domaines des mathématiques et de la technologie logicielle, la complexité de l'optimisation des fosses n'a pas encore été résolue par une équation unique.
Maximisez la valeur du projet souterrain à l'aide de Pseudoflow dans la solution de planification minière de Deswik
Découvrez comment le consultant minier principal, Jun Liang, d'ORELOGY Mine Consulting a appliqué Pseudoflow dans la solution de planification minière de Deswik pour augmenter la valeur du projet d'une mine souterraine.
Deswik fournit une solution de relevé intégrée qui permet un flux de données fluide
Deswik s'est associée au principal fournisseur international de matériel, RIEGL, pour fournir une solution holistique aux géomètres miniers.
Sandvik fait l'acquisition de Deswik et lance une nouvelle division des technologies minières numériques
Deswik a signé un accord en vue de son acquisition par Sandvik, le groupe mondial de haute technologie et d'ingénierie dont le siège social est en Suède.
Deswik fait l'acquisition d'applications minières mobiles
Deswik a étendu les capacités numériques des opérations minières avec l'acquisition d'une suite d'applications mobiles élaborées par MineOps Software.
La mine Kittila d'Agnico Eagle augmente sa productivité avec une planification dynamique des quarts
La mine Kittila d'Agnico Eagle a été confrontée à des défis pour aligner les plannings à long terme, à moyen terme et opérationnels. Après la mise en œuvre de l'OPS, Kittila a pu mettre en place des changements de quarts de travail plus rapides, une planification centralisée et une visibilité relative à la conformité des plans, ce qui a amélioré la communication, la collaboration, la productivité et la prise de décision.
Efficience de la gestion des données techniques pour OZ Minerals grâce à Deswik MDM
La mise en œuvre de MDM a permis à Prominent Hill d'accroître sa productivité en assurant gestion des données critiques, transparence et gouvernance.
Deswik poursuit son expansion à l'étranger avec une acquisition brésilienne
Deswik a intensifié son expansion à l'étranger en prenant une participation minoritaire dans son partenaire revendeur brésilien de longue date, MCB Services and Minerals.
Guidelines and Considerations for Open Pit Designers
It is important to remember that software assists the design process, not the design itself. The design is controlled by the engineer doing the design. Julian Poniewierski (formerly Deswik) explains in this article guidelines and considerations for designing your first pit.
Pseudoflow Explained
Julian Poniewierski (formerly Deswik) discusses Pseudoflow pit optimization in comparison to Whittle LG pit optimization.
Une solution intégrée pour de meilleures performances
Pour améliorer la supervision et la planification à moyen terme, Anglo American s'est associée à Deswik pour élaborer un ensemble logiciel complet de conception et de planification des opérations minières.
Intégrez la cartographie géologique à une planification plus globale
Les capacités de Deswik Mapping ont permis aux mines de Vale en Ontario d'améliorer la façon dont elles collectent et stockent les données géologiques. Grâce à la centralisation du travail de son personnel technique sur une seule plateforme, Vale a réussi à uniformiser ses processus de cartographie géologique.
Augmentation considérable de la valeur actuelle nette pour les opérations minières souterraines de métaux
En automatisant et en optimisant la planification de 80 000 tâches de production et de développement, APEX a considérablement augmenté la valeur actuelle nette (NPV) de plus de 30 % de l'une des plus grandes mines d'abattage de métal souterrain, tout en assurant la conformité à plus de 230 contraintes de planification.
Automatisation et optimisation de systèmes complexes de la chaîne d'approvisionnement du charbon
BOLT a révolutionné la chaîne d'approvisionnement en charbon de BHP Mitsui Coal (BMC) en automatisant et en optimisant les processus. En passant de la planification manuelle à une plateforme centralisée dans le cloud, BOLT a réduit le temps de génération du plan, qui est passé d'une journée entière à moins d'une heure. Cette amélioration a non seulement dynamisé les performances de la chaîne d'approvisionnement, mais a également accru les capacités de l'équipe de planification, ce qui a permis de prendre des décisions de planification plus optimales.
Augmentation significative de la valeur actuelle nette d'une nouvelle mine de potasse
Avec APEX, une nouvelle mine de potasse a pu relever les défis de la durée de vie de la mine, augmenter sa valeur actuelle nette (NPV) de 11 % et réduire considérablement le temps de planification, qui est passé de 38 heures à 2 heures.
Maximisation de la valeur actuelle nette du plus grand gisement de charbon au monde
Avec BOLT, Adaro MetCoal a maximisé la valeur actuelle nette (NPV) du plus grand gisement de charbon métallurgique non développé au monde dans le bassin charbonnier de Maruwai. BOLT a permis à Adaro d'évaluer et de hiérarchiser la séquence de développement de ses sept zones de concession et le calendrier des investissements dans les infrastructures de traitement et de logistique. Cela a entraîné une différence de 50 % de la valeur actuelle nette entre le meilleur et le pire scénario, ce qui équivaut à des milliards de dollars d'amélioration potentielle.
Maximisez les profits en automatisant et en optimisant les systèmes de la chaîne d'approvisionnement du charbon
Avec BOLT, Bengalla Mining Company a amélioré l'efficacité de sa chaîne d'approvisionnement en charbon. En automatisant et en optimisant les processus de planification, BOLT a augmenté ses marges bénéficiaires de 10 % et réduit considérablement le temps de planification, qui est passé de plusieurs semaines à quelques minutes.
Utilisation de la simulation pour maximiser la capacité dans une chaîne d'approvisionnement minière complexe
Newcrest a collaboré avec Deswik pour élaborer un outil d'optimisation en temps réel pour la gestion des chargeurs-transporteurs (LHD) à Cadia Valley ; ceci a diminué la congestion et renforcé l'efficacité, ce qui a entraîné une augmentation de la productivité de 20 %.
Maximisation de la valeur actuelle nette pour une chaîne de valeur du minerai de fer à l'aide des mathématiques industrielles
BOLT a aidé une société minière de premier plan au monde à maximiser la valeur actuelle nette (NPV) de leur chaîne de valeur de minerai de fer. En centralisant et en automatisant les efforts de planification, BOLT a amélioré les décisions optimisées de mélange et de stockage et a aligné la production sur la demande. Cela a entraîné une amélioration de la valeur actuelle nette de 10 %, une meilleure collaboration au sein de l'organisation et une analyse rapide des scénarios hypothétiques.
Des solutions innovantes pour les opérations mondiales de bauxite
BOLT a aidé un producteur mondial d'aluminium à optimiser la prise de décision stratégique dans ses opérations de bauxite. En planifiant l'ensemble de la chaîne de valeur de la bauxite avec une haute fidélité, BOLT a réduit considérablement le temps de planification, qui est passé de plusieurs semaines à quelques heures, ce qui a entraîné une augmentation considérable de la valeur actuelle nette (NPV) et une amélioration de l'efficacité du portefeuille mondial du client.
Automatisation des processus de planification manuelle pour l'une des plus grandes mines de charbon du monde
BOLT a automatisé les processus de planification manuelle de l'une des plus grandes mines de charbon au monde, ce qui a considérablement amélioré l'efficacité. La solution a optimisé les mouvements quotidiens des matières et les décisions de traitement, en garantissant que les proportions de qualité de charbon correctes étaient fournies à la CHPP. Cette automatisation a réduit le temps de planification qui est passé de quelques jours à quelques minutes, a amélioré l'adhésion au plan et a rendu les rapports accessibles à un public plus large.
Optimisation de la planification des navires pour réduire les coûts, prévenir les goulets d'étranglement et réduire les risques dans une chaîne d'approvisionnement d'aluminium
BOLT a optimisé la planification des navires pour un producteur d'aluminium, ce qui a réduit les coûts et évité les goulets d'étranglement. La centralisation de la planification et de l'automatisation des calendriers ont amélioré la coordination du transport par camion, par chemin de fer et par chargement de navires, ce qui a entraîné des économies annuelles importantes sur les coûts de transport et une efficacité accrue de la chaîne d'approvisionnement.
Optimisation des décisions complexes de la chaîne d'approvisionnement pour un producteur de minerai de fer
Grâce à la mise en œuvre de BOLT, un producteur de minerai de fer a amélioré ses décisions en matière de stockage, de traitement, de transport, de mélange et de chargement de navires, ce qui a entraîné une augmentation de 44 % du chargement direct et une augmentation des ventes de produits.
Utilisation de l'optimisation et de la simulation pour maximiser la productivité minière
Newcrest a collaboré avec Deswik pour élaborer un outil d'optimisation en temps réel pour la gestion des chargeurs-transporteurs (LHD) à Cadia Valley ; ceci a diminué la congestion et renforcé l'efficacité, ce qui a entraîné une augmentation de la productivité de 20 %.
Réduction de l'incertitude et amélioration des processus de planification avec la simulation
OZ Minerals a utilisé l'ORB de Deswik pour modéliser ses opérations de foudroyage des sous-niveaux, ce qui lui a permis de comprendre les possibilités stratégiques et opérationnelles avant la production.
Premier système de contrôle des intervalles courts hautement automatisé au monde pour les mines souterraines de roche dure
Grâce à la mise en œuvre de l'ORB, une grande société minière d'or a pu augmenter la productivité de sa mine de 20 % et la conformité des extractions de 17 % en optimisant les décisions de répartition des chargeurs-transporteurs (LHD) en temps réel.
Planification automatisée des équipements pour l'utilisation optimale des actifs et l'extraction efficace des roches dures
Le planificateur d'équipements ORB de Deswik a optimisé l'utilisation et l'efficacité des actifs pour une société minière spécialisée dans le cuivre en automatisant la planification, en donnant la priorité aux tâches à forte valeur et en permettant aux chefs d'équipe de se concentrer sur les tâches critiques telles que les inspections de sécurité.
Optimisation d'une chaîne de valeur du charbon de plusieurs mines pour accroître les efficiences, débloquer les revenus et réaliser des économies
BOLT a été déployé auprès d'un producteur de charbon australien de premier plan pour améliorer ses complexités logistiques sur de multiples horizons de planification.
Maximiser la rentabilité en utilisant l'aide à la décision basée sur l'optimisation
En automatisant la planification de l'assemblage de la cargaison et la livraison des produits, RACE Planner a réduit le temps de planification d'Aurizon de quelques heures à quelques minutes, augmenté l'utilisation des actifs et amélioré le débit, ce qui a entraîné une rentabilité plus élevée et de meilleurs niveaux de service pour ses clients.
Une rentabilité et un débit accrus pour les chaînes d'approvisionnement ferroviaires
Grâce à RACE Planner, Pacific National, l'une des plus grandes entreprises de fret ferroviaire d'Australie, a optimisé ses chaînes d'approvisionnement ferroviaires en automatisant les processus de planification, en réduisant le temps de planification et en augmentant l'utilisation des actifs, ce qui a permis d'améliorer la rentabilité et le rendement.
Amélioration de la rentabilité d'un producteur mondial de farine grâce aux mathématiques industrielles
Avec BOLT, un producteur mondial de farine a optimisé sa chaîne d'approvisionnement et ses processus de production, en réduisant ses besoins en matières premières de 50 % et en améliorant la rentabilité de 13 %. BOLT a permis à l'entreprise de mettre en œuvre le stockage intelligent, un transport maritime rentable et l'approvisionnement en céréales, en dépit de la complexité due à la disponibilité fluctuante des matières premières, des contraintes logistiques et des diverses demandes des clients.
La mine LZ5 d'Agnico Eagle augmente la productivité avec le suivi en temps réel de la conformité au plan
La mine LZ5 d'Agnico Eagle a atteint un développement latéral de 400 à 500 mètres avec une conformité au plan à 70 %. Pour faciliter la planification à court terme et la gestion des quarts de travail, LZ5 a mis en œuvre OPS, ce qui a porté l'avancement mensuel de ses galeries à 700 m, avec une conformité du plan atteignant 94 %.
Block Model Knowledge for Mining Engineers - An Introduction
Julian Poniewierski (former Deswik) introduces key concepts of mineral resource block models to support junior engineers entering mine planning roles. This article provides foundational guidance on structure, use, and common pitfalls.